Back to overview
Maintenance

Maintenance: Network Infrastructure Upgrades

Sep 14 at 05:00am BST  –  Sep 14 at 01:00pm BST
Affected services
Customer Portal
Dedicated Servers (lon1-a4)
SMTP Relay 1 (London)
Nameserver 1
Nameserver 2

Resolved
Sep 14 at 05:00am BST

We will perform maintenance on our network infrastructure in our London 1 location to upgrade our access layer switches to 25Gb capable equipment.

As part of this, we will be re-patching hypervisor nodes into the new access switches, however, we will re-route traffic through alternate uplinks beforehand.

Dedicated server customers with the prefix "lon1-a4" will be unaffected by the maintenance.

We expect disruption to be minimal and will update this page with more information as required.